Introduction, Aims and Objectives, Review of Literature, Material and Method – 7 to 10 Days
Table (Minimum 4 Days).
Result and Analysis (Minimum 5 Days after Confirmation Table).
Full Thesis 7 to 10 Days after final confirmation
Table with p-value calculation (Minimum 5 Days)
Diagram and Interpretation (Minimum 4 Days after table conformation).
WhatsApp us